Approved sample and drawing revision
Ensure the approved sample matches the file; track revisions and change impact.
ENGINEERING SERVICE / 02
Start with an approved sample and file revision. Coordinate quantity, process, finishing, inspection and packing, with changes recorded throughout the trial.
Configuration, cost and scope follow assessment
01 / PREPARATION
Information need not be complete at first, but critical assumptions must be agreed before making.
Ensure the approved sample matches the file; track revisions and change impact.
Separate quantity, process and finishing requirements; agree any material substitutions.
Define batch checks, protective packing and milestones without assuming unconfirmed commitments.
02 / WORKFLOW
Verify agreed quantity, quality items and batch records. Approve sample changes, material substitutions and extra processing before production.
Trial production is not a promise of unlimited capacity or continuous supply. Volume, lead time, certification and ongoing supply require agreement.
Include requirements in your briefSTART WITH WHAT YOU HAVE
Drawings, approved samples or module plans can all be a starting point.